SIADMI supplies 2 boil-off gas compressors

12 July 2021

SIADMI’s boil off gas compressor.

SIAD Macchine Impianti (SIADMI) has supplied two boil-off gas (BOG) compressors to the first coastal storage facility built in the Mediterranean by Italy’s Gas and Heat.

The depot consists of six horizontal low-pressure cryogenic tanks with a total capacity of 9000 M³. The new plant, on the Mediterranean island of Sardinia, will become one of the first reference points for liquefied natural gas and the bunkering of ships in the region. SIAD Macchine Impianti supplied two BOG compressors, which are designed to maintain stable pressure in the storage tank of the plant.

Mauro Evangelisti, chairman of Gas and Heat, said, “The project of the first so-called small-scale LNG depot started in 2015. Then, in 2017 we built four tanks and gas plants installed onboard the bunker vessel Avenir Accolade, which docked... in the port of Oristano with a cargo of over 7000 cubic meters, and its twin Avenir Advantage.”

MAGAZINE
NEWSLETTER
Delivered directly to your inbox, CompressorTech² News features the pick of the breaking news stories, product launches, show reports and more from KHL's world-class editorial team.
CONNECT WITH THE TEAM
Jack Burke Senior Editor Tel: +1 262-754-4150 E-mail: [email protected]
Art Aiello Editor Tel: +1 262-754-4131 E-mail: [email protected]
Gabriele Dinsel Brand Manager Tel: +49 711 3416 74 71 E-mail: [email protected]