L.A. Turbine Ships First Ares Turboexpander-Compressor

L.A. Turbine has shipped its first Ares active magnetic bearing (AMB) turboexpander-compressor to a new processing plant in the Bakken Shale Play of North Dakota. The Ares turboexander-compressor, designed for a plant flow rate of 200 MMcfd (5.6 X 106 m3/d), will be used for natural gas liquids (NGL) processing. Installation and commissioning is set for the third quarter of this year.

The Ares turboexpander-compressor features a skid-mounted AMB control system and programmable logic control (PLC) panel. This configuration allows operators to place the skid onsite and power it up without running yards of wires to a control room.

L.A. Turbine and Waukesha Magnetic Bearings collaborated on the new turboexpander-compressor, which also features 1/3 less space than oil-dependent variants. Waukesha Magnetic Bearings supplied the Ares turboexpander-compressor with its AMB hardware, as well as the Zephyr five-axis digital controller (see COMPRESSORTECH2, Aug-Sept. 2018, p. 29).

Related Articles

A Quick Scan For Quality
Burckhardt Acquires Additional 20% Stake In Arkos Group
U.S. Gas Production Still Rolling
Archrock Set To Acquire Elite Compression
Sauer Compressors Introduces New Gas Compressor Series
SCFM Compression Expands in Tulsa
Ariel Ships Its 60,000th Reciprocating Compressor
MAN Supplying Six Compressor Trains For MODEC FPSO Vessel

Latest News

12th EFRC Conference Call For Papers
Kobe Steel Selects Kobelco Europe In Germany As New European Headquarters
Capstone Turbines For Kazakhstan
A Quick Scan For Quality
Pennsylvania Set Gas Record In 2018
Gas Produced Here Stays Here
Burckhardt Acquires Additional 20% Stake In Arkos Group
Miratech Acquires German Emissions Company
Dean Named To Burckhardt Board

Log In

Forgotten Password?

Haven’t got an account? Click here to register.