Burckhardt Compressors Selected For LNG Vessels
04 December 2020
Burckhardt Compression received an order for eight low-pressure compressor systems for boil-off gas (BOG) management on four container vessels.
C-LNG Solutions, a Singapore-based specialist in LNG fuel gas products and LNG cargo handling, placed the order. The company will use the compressor systems for compressing boil-off gas produced from evaporating LNG on the vessels. The compressed gas can then be used as fuel for the onboard WinGD X-DF two-stroke propulsion engines.
Burckhardt Compression’s 2K70 Laby BOG compressor system handles small mass flows at cryogenic gas temperatures without the need for BOG pre-heating, the company said.
STAY CONNECTED
Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.
POWER SOURCING GUIDE
The trusted reference and buyer’s guide for 83 years
The original “desktop search engine,” guiding nearly 10,000 users in more than 90 countries it is the primary reference for specifications and details on all the components that go into engine systems.
Visit Now